Bench active · EN ↔ TH · TEL +66 02-859-2145 · NDA from first email · 1-hour quote SLA
EN TH
Request a Proposal
EPD · ISO 14025 · EN 15804 · PCR · new service, launched 2026

Thailand has no EPD verifier.
We built the service anyway.

01  The gap
Not one approved EPD verifier is based in Thailand. Every valid Thai EPD was verified from Prague, Athens, the UK or Australia.
02  The deliverable
A verified, registered Environmental Product Declaration — not a report that still needs someone else to finish it.
03  The clock
The EU Construction Products Regulation began applying on 8 January 2026 and reaches Thai-made products on the same terms as European ones.
The market, counted

Two hundred declarations. Zero verifiers on the ground.

This is a market with real, growing demand and no domestic capacity to serve it. Thai manufacturers publishing to the International EPD System have had to arrange verification from Europe or Australia — across time zones, in English, with no one in the room who has seen a Thai plant.

The numbers below are public. You can check every one of them on the International EPD System’s own register.

217
Valid Thai EPDs
Published in the International EPD System
13
Thai organisations
Roughly 88% of them from the SCG and SCC families
~100
Published in 2026 alone
The Thai total has doubled in eight months
0
Verifiers based in Thailand
The nearest approved individual is in Indonesia
Where Thai EPDs get verified today

Prague. Athens. London. Sydney. Not Bangkok.

Verification of a Thai product currently means engaging a verifier who has never been to the site, working across a five-to-seven-hour time difference, with every query and response passing through a language boundary. It is workable. It is also slow, and it is why so few Thai manufacturers have got one.

Othello runs the whole engagement from Bangkok. Same standard, same independent verification, same registration — organised on your time zone, in your language, by people who can walk your production line.

Requirement Arranged from abroad Othello
Site and process understandingSomeone who has seen the plant
–
Works in Thai and EnglishPlant floor to programme operator
–
Same time zone as your team
–
Independent accredited verificationRequired by ISO 14025 either way
Registration on the programme register
One accountable contractRather than assembling it yourself
–

Verification is always carried out by an accredited verifier independent of the party that prepared the declaration — that independence is what an EPD is worth. What changes here is who organises and carries the engagement.

The domestic label trap

An EPD Thailand label will not clear a European specification.

Thailand has its own domestic environmental declaration label, run by TEI, and manufacturers reasonably assume it covers them. It does not travel. It is not aligned to EN 15804 and carries no international recognition, so a European specifier, a Singapore Green Mark GoldPLUS submission or an EC3 entry will not take it in place of a registered international EPD.

If your buyer is in Bangkok, the domestic label may be fine. If your buyer is in Rotterdam, Singapore or a data-centre procurement team, it is not the document they asked for. The same pattern runs through ISCC certification: a scheme only counts where the buyer recognises it.

Why now

Four clocks, all running.

01 EU Construction Products Regulation — (EU) 2024/3110 applies from 8 January 2026; global warming potential must be declared, with full EN 15804+A2 core indicators from 9 January 2030. It phases in category by category, cement, concrete, steel and insulation first In force
02 Thai green public procurement — the GPP framework is moving toward a carbon threshold for cement in e-GP, and public procurement is roughly 40% of Thai cement demand Moving
03 Data-centre construction in Thailand — hyperscale builds are asking concrete and steel suppliers for EPDs and EC3 entries now, not eventually Immediate
04 Green building schemes — Singapore Green Mark GoldPLUS and Platinum require EPDs; TREES MR6 and several hundred LEED projects in the region reward them Ongoing
05 Roughly US$0.9–1 billion a year of Thai exports sit in the product categories the EU regulation reaches first At stake
If you already hold a TGO CFP

You are further along than you think.

A TGO Carbon Footprint of Product is an ISO 14067 greenhouse-gas number. An EPD is broader — acidification, eutrophication, resource use and more, assessed under a Product Category Rule and, for construction, EN 15804. The two are not interchangeable, but they are built from much of the same evidence.

Most exporters end up needing both: the CFP for the Thai market and the TGO relationship, the EPD for the European buyer — and if you ship steel or aluminium into the EU, CBAM draws on the same A1–A3 data spine, though an EPD never satisfies a CBAM report on its own. Starting from a completed CFP typically removes the hardest month of the work.

Requirement TGO CFP EPD
Greenhouse gasesISO 14067
Acidification, eutrophication, resource use
–
Product Category Rule conformance
–
EN 15804 for construction products
–
Recognised by European specifiers
–

The inventory work transfers. The boundary, the PCR conformance and the impact assessment do not — which is the part this engagement does.

How the engagement runs

Data first. Because that is what runs late.

01 Scoping and PCR selection — the product, the declared unit, the right Product Category Rule and the programme operator Week 1–2
02 Data audit — what your plant records, what your suppliers can evidence, and where the gaps are, before any modelling starts Week 2–4
03 LCA modelling — to ISO 14040 and 14044, against the PCR and EN 15804 where it applies Week 4–9
04 Declaration and evidence pack — the EPD itself plus the background report, bilingual where you need it Week 8–11
05 Independent verification and registration — we manage it and answer the findings through to publication on the register Week 10–14
What you get

A declaration with your name on the register.

The verification statement and the registration are two different things, and only the second one puts your product where a buyer can find it. Both are in scope here.

A published EPD is typically valid for five years, PCR-dependent, so this is a document that works for you well past the engagement.

5yr
Typical validity
PCR-dependent, from publication
2–4wk
Verification window
Once the declaration is ready
3–4mo
End to end
For a first product with reasonable data
1
Team, start to registered
Data collection through to a published declaration
Frequently asked

The questions manufacturers actually ask.

01
Is there an EPD verifier in Thailand?No. The International EPD System publishes its approved verifiers, and no individual or body on that list is based in Thailand — or anywhere in South-East Asia apart from a single individual in Indonesia. Every valid Thai EPD in the system was verified from Europe or Australia. That is why the work has been slow and expensive to arrange from Bangkok, and it is the gap this service closes.
02
Do we end up with a verified EPD?Yes. The engagement runs from data collection through to a verified, registered declaration published on the programme operator’s register — LCA modelling, PCR conformance, the declaration itself, independent verification and publication. Verification is carried out by an accredited independent verifier, which is precisely what makes the document worth showing a buyer. You deal with one team throughout.
03
What is an EPD, in one paragraph?An Environmental Product Declaration is a Type III environmental declaration under ISO 14025: a standardised, third-party-verified statement of a product’s environmental impacts across its life cycle. It is built from an LCA, follows a Product Category Rule so products in the same category are comparable, and for construction products follows EN 15804. It is a datasheet, not a claim — which is why buyers and regulators accept it.
04
We have an EPD Thailand label from TEI. Is that the same?It is not, and the difference matters at the border. The domestic TEI label is a Thai scheme without EN 15804 alignment or international recognition, so a European specifier, a Singapore Green Mark submission or an EC3 database entry will not accept it in place of an internationally registered EPD. If your buyer is outside Thailand, the domestic label will not do the job you need it to do.
05
Why has this become urgent?Several clocks at once. The EU Construction Products Regulation (EU) 2024/3110 began applying on 8 January 2026 and requires a declaration of global warming potential from that date, with the full EN 15804+A2 core indicators from 9 January 2030 — and it applies to products placed on the EU market wherever they are made. Domestically, Thailand’s green public procurement framework is moving toward a carbon threshold for cement, and public procurement is roughly 40% of Thai cement demand. Meanwhile the hyperscale data-centre builds going up in Thailand are asking their concrete and steel suppliers for EPDs now.
06
We already have a TGO CFP. Is that the same thing?No, but it is a substantial head start. A TGO Carbon Footprint of Product covers greenhouse gases under ISO 14067. An EPD covers a wider set of impact categories under a PCR and, for construction, EN 15804 — acidification, eutrophication, resource use and more, alongside climate. Much of the inventory work transfers; the boundary, the PCR conformance and the impact assessment do not.
07
How long does it take?For a single product with reasonable data, plan on roughly three to four months end to end. Verification itself is a two-to-four-week window once the declaration is ready. The long pole is almost always supplier data quality, not the modelling — which is why the engagement starts with a data audit rather than with a model.
08
Do you work in both languages?Yes. The LCA background report, the declaration and the supporting evidence are produced bilingually to ISO 17100 where you need them in Thai and English — which matters when your plant runs in Thai and your verifier, your buyer and the programme operator all read English.
Proof · independently checkable

Checkable, not claimable.

4.0/5.0
FTSE Russell ESG
Delivered 2025 under LSEG global methodology
2020
Founded
Bangkok — US government origin
1,000+
Bilingual reports
Delivered since 2020
Carbon accounting — powered by KClimate, delivered by Othello PARTNERSHIP
Thai edition of a UK PACT carbon-pricing report, with DLA Piper DELIVERED
ISO 17100 Translate-Edit-Proofread, three qualified linguists per job METHOD

Client engagements run under NDA from the first email, so most names stay private. What is named here is named because it is already public — and everything above can be checked without asking us.

Start with the product, not the paperwork

Tell us the product. We will tell you the route.

Scoping starts with what you make, who is asking for the declaration and what data your plant already holds. Fees are quoted once the product and its Product Category Rule are scoped, because a simple extruded product and a complex assembly are not the same job.

FTSE 2026 PlaybooksFree ESG disclosure guides
Chat on LINEแอดไลน์ · ตอบใน 1 ชม.
Add Othello ESG on LINE (QR code)
แอดไลน์ · Add us on LINE
Scan to chat with Othello ESG on LINE — a reply within one business hour, under NDA from the first message.
Open LINE →
Recognised & delivered Credited in DLA Piper × UK PACT × DCCE’s carbon-pricing report · SET JUMP+ Advisory Pool listed advisor · FTSE Russell 4.0/5.0 delivered · ISO 17100 certified
Get a 1-hour quote →

Research & Reports

Free Tools

· YouTube
Free tools & research State of ESG Disclosure· ESG Rating Check· FTSE 2026 Playbooks· Regulation Radar· Greenwashing Checker