{"id":33922,"date":"2026-10-21T02:33:07","date_gmt":"2026-10-21T02:33:07","guid":{"rendered":"https:\/\/www.othellointernational.com\/thailand-last-en-15804-a1-epd-expired-renewal-rules\/"},"modified":"2026-10-21T02:35:07","modified_gmt":"2026-10-21T02:35:07","slug":"thailand-last-en-15804-a1-epd-expired-renewal-rules","status":"publish","type":"post","link":"https:\/\/www.othellointernational.com\/th\/thailand-last-en-15804-a1-epd-expired-renewal-rules\/","title":{"rendered":"Thailand\u2019s Last EN 15804+A1 EPD Just Expired. Here Is What Renewal Actually Requires"},"content":{"rendered":"<style>\n.obg{--r:#ED4036;--r1:#FF5046;--gold:#e0a93a;--ok:#3ddc84;--w:#fff;--w1:rgba(255,255,255,.85);--w2:rgba(255,255,255,.60);--w3:rgba(255,255,255,.42);--gl:rgba(255,255,255,.10);--card:linear-gradient(168deg,rgba(255,255,255,.055),rgba(255,255,255,.015));font-family:'Poppins',-apple-system,BlinkMacSystemFont,sans-serif;-webkit-box-sizing:border-box;box-sizing:border-box}\n.obg *,.obg *::before,.obg *::after{box-sizing:border-box}\n.obg{position:relative;margin:30px 0;border-radius:16px}\n.obg-lb{font-family:'Poppins',sans-serif;font-size:11px;letter-spacing:.15em;text-transform:uppercase;color:var(--r1);font-weight:700;display:flex;align-items:center;gap:9px;margin-bottom:15px}\n.obg-lb::before{content:\"\";width:22px;height:2px;background:var(--r);border-radius:2px}\n\/* TOC \/ what's covered *\/\n.obg-toc{background:var(--card);border:1px solid var(--gl);border-radius:16px;padding:24px 26px}\n.obg-toc ol{margin:0;padding:0;list-style:none;counter-reset:t;display:grid;grid-template-columns:repeat(2,1fr);gap:10px 26px}\n.obg-toc li{counter-increment:t;position:relative;padding-left:34px;line-height:1.4}\n.obg-toc li::before{content:counter(t,decimal-leading-zero);position:absolute;left:0;top:0;font-family:Georgia,serif;font-style:italic;font-size:14px;color:var(--r);font-weight:600}\n.obg-toc a{color:var(--w1);text-decoration:none;font-size:14.5px;border-bottom:1px solid transparent;transition:all .2s}\n.obg-toc a:hover{color:var(--r1);border-color:rgba(237,64,54,.4)}\n\/* key takeaways *\/\n.obg-take{background:var(--card);border:1px solid var(--gl);border-left:3px solid var(--r);border-radius:14px;padding:24px 28px}\n.obg-take ul{margin:0;padding:0;list-style:none;display:grid;gap:12px}\n.obg-take li{position:relative;padding-left:30px;color:var(--w1);font-size:15px;line-height:1.55}\n.obg-take li b{color:var(--w)}\n.obg-take li::before{content:\"\";position:absolute;left:0;top:2px;width:18px;height:18px;border-radius:5px;background:rgba(237,64,54,.14);border:1px solid var(--r)}\n.obg-take li::after{content:\"\";position:absolute;left:6px;top:5px;width:5px;height:9px;border:solid var(--r1);border-width:0 2px 2px 0;transform:rotate(45deg)}\n\/* stat row *\/\n.obg-stats{display:grid;grid-template-columns:repeat(auto-fit,minmax(140px,1fr));gap:1px;background:var(--gl);border:1px solid var(--gl);border-radius:16px;overflow:hidden}\n.obg-stat{background:#0a0a0d;padding:26px 20px;text-align:center;position:relative}\n.obg-sn{font-family:'Fraunces',Georgia,serif;font-style:italic;font-weight:600;font-size:40px;color:var(--r);line-height:1;letter-spacing:-.01em}\n.obg-sn .u{font-size:.42em;font-family:'Poppins',sans-serif;font-style:normal;color:var(--w2);letter-spacing:.02em}\n.obg-sl{font-family:'Poppins',sans-serif;font-size:10.5px;letter-spacing:.08em;color:var(--w2);margin-top:11px;line-height:1.45;text-transform:uppercase}\n\/* comparison table *\/\n.obg-tw{overflow-x:auto;border:1px solid var(--gl);border-radius:16px;background:linear-gradient(168deg,rgba(255,255,255,.04),rgba(255,255,255,.012))}\n.obg-table{width:100%;border-collapse:collapse;font-size:14px;min-width:520px}\n.obg-table th,.obg-table td{padding:14px 16px;text-align:left;border-bottom:1px solid rgba(255,255,255,.07);vertical-align:top;line-height:1.45;color:var(--w1)}\n.obg-table thead th{font-family:'Poppins',sans-serif;font-size:10.5px;letter-spacing:.07em;text-transform:uppercase;color:var(--w);font-weight:700;background:rgba(255,255,255,.04)}\n.obg-table thead th.hi{color:var(--r1);background:rgba(237,64,54,.12)}\n.obg-table tbody th{font-family:'Poppins',sans-serif;font-size:10px;letter-spacing:.04em;text-transform:uppercase;color:var(--w2);font-weight:700;white-space:nowrap;background:rgba(255,255,255,.02)}\n.obg-table td.hi{color:var(--w);background:rgba(237,64,54,.07)}\n.obg-table tr:last-child th,.obg-table tr:last-child td{border-bottom:0}\n.obg-yes{color:var(--ok);font-weight:600}.obg-no{color:var(--r1);font-weight:600}\n\/* process flow *\/\n.obg-flow{display:grid;grid-template-columns:repeat(auto-fit,minmax(180px,1fr));gap:13px}\n.obg-step{background:var(--card);border:1px solid var(--gl);border-radius:14px;padding:22px 20px;position:relative;overflow:hidden}\n.obg-step::after{content:\"\";position:absolute;top:0;left:0;width:100%;height:2px;background:linear-gradient(90deg,var(--r),var(--gold));transform:scaleX(0);transform-origin:left;transition:transform .4s}\n.obg-step:hover::after{transform:scaleX(1)}\n.obg-snum{font-family:'Fraunces',Georgia,serif;font-style:italic;color:#fff;font-size:17px;font-weight:600;width:36px;height:36px;border-radius:10px;display:flex;align-items:center;justify-content:center;background:linear-gradient(140deg,var(--r),#C2261C);margin-bottom:14px}\n.obg-sh{font-size:15.5px;font-weight:600;color:var(--w);margin:0 0 5px}\n.obg-sp{font-size:13px;color:var(--w2);line-height:1.5;margin:0}\n\/* pull quote *\/\n.obg-quote{border-left:3px solid var(--r);padding:6px 0 6px 26px;margin:32px 0}\n.obg-quote p{font-family:'Fraunces',Georgia,serif;font-style:italic;font-size:22px;line-height:1.4;color:var(--w);margin:0;font-weight:500}\n.obg-quote cite{display:block;margin-top:12px;font-family:'Poppins',sans-serif;font-style:normal;font-size:12px;letter-spacing:.06em;text-transform:uppercase;color:var(--r1);font-weight:600}\n\/* callout \/ CTA band *\/\n.obg-band{background:linear-gradient(150deg,rgba(237,64,54,.13),rgba(255,255,255,.02));border:1px solid rgba(237,64,54,.3);border-radius:16px;padding:26px 30px;position:relative;overflow:hidden}\n.obg-band::before{content:\"\";position:absolute;top:0;left:0;width:100%;height:3px;background:linear-gradient(90deg,var(--r),var(--gold))}\n.obg-band h4{font-family:'Fraunces',Georgia,serif;font-size:21px;font-weight:600;color:var(--w);margin:0 0 8px;line-height:1.2}\n.obg-band p{font-size:14.5px;color:var(--w1);line-height:1.6;margin:0 0 16px}\n.obg-cta{display:inline-flex;align-items:center;gap:9px;background:var(--r);color:#fff!important;text-decoration:none;font-family:'Poppins',sans-serif;font-size:13px;font-weight:600;letter-spacing:.04em;padding:12px 22px;border-radius:8px;transition:all .3s}\n.obg-cta:hover{background:var(--r1);transform:translateY(-2px);box-shadow:0 12px 30px -8px rgba(237,64,54,.5)}\n.obg-cta::after{content:\"\\2192\";transition:transform .3s}\n.obg-cta:hover::after{transform:translateX(4px)}\n\/* fact \/ at-a-glance grid *\/\n.obg-facts{display:grid;grid-template-columns:repeat(auto-fit,minmax(200px,1fr));gap:13px}\n.obg-fact{background:var(--card);border:1px solid var(--gl);border-radius:13px;padding:20px 20px}\n.obg-fact .obg-fh{font-family:'Poppins',sans-serif;font-size:10px;letter-spacing:.1em;text-transform:uppercase;color:var(--r1);font-weight:700;margin-bottom:9px}\n.obg-fact p{font-size:13.5px;color:var(--w1);line-height:1.55;margin:0}\n.obg-fact p b{color:var(--w)}\n\/* fix legacy light-theme related-reading box -> dark brand (inline styles beaten with !important) *\/\n.oth-related,.oth-related-reading{background:linear-gradient(168deg,rgba(255,255,255,.055),rgba(255,255,255,.015))!important;border:1px solid rgba(255,255,255,.1)!important;border-left:3px solid #ED4036!important;border-radius:14px!important;color:rgba(255,255,255,.85)!important}\n.oth-related p,.oth-related-reading p,.oth-related strong,.oth-related-reading strong,.oth-related b,.oth-related-reading b{color:#fff!important}\n.oth-related a,.oth-related-reading a{color:#FF5046!important}\n.oth-related li,.oth-related-reading li,.oth-related span,.oth-related-reading span{color:rgba(255,255,255,.85)!important}\n@media(max-width:640px){\n  .obg-toc ol{grid-template-columns:1fr}\n  .obg-quote p{font-size:19px}\n  .obg-band{padding:22px 20px}\n}\n<\/style>\n<p>\u0e2a\u0e48\u0e07\u0e21\u0e2d\u0e1a <strong>19 October 2026<\/strong>, an Environmental Product Declaration for a gypsum board made in Thailand reached the end of its five-year validity. The International EPD System library now marks it <strong>\u201cExpired\u201d<\/strong>. On its own that is a routine event. What makes it worth noting is the standard behind it. It was the <strong>last Thai-owned EPD in the library still declared under EN 15804+A1<\/strong>, the version of the European construction-product standard that the programme stopped accepting for new work in 2022.<\/p>\n\n<p>We crawled every Thai entry in the library on 21 October 2026. There are <strong>217 entries from 12 Thailand-based owners: 216 valid, 1 expired<\/strong>. Not one valid Thai EPD is still on A1. The A1 era in Thailand is over, and the first renewal question has arrived with it.<\/p>\n\n<!--OBG-G--><div class=\"obg obg-toc\"><div class=\"obg-lb\">What this guide covers<\/div><ol><li><a href=\"#what-expired-on-19-october\">What expired on 19 October<\/a><\/li><li><a href=\"#renewal-is-a-re-verification-not-a-date-change\">Renewal is a re-verification, not a date change<\/a><\/li><li><a href=\"#the-real-renewal-wave-128-epds-on-a-superseded-pcr-version\">The real renewal wave: 128 EPDs on a superseded PCR version<\/a><\/li><li><a href=\"#the-one-year-window-and-what-an-expired-epd-may-not-do\">The one-year window, and what an expired EPD may not do<\/a><\/li><li><a href=\"#the-english-rule-most-thai-teams-overlook\">The English rule most Thai teams overlook<\/a><\/li><li><a href=\"#where-the-evidence-runs-out\">Where the evidence runs out<\/a><\/li><li><a href=\"#what-to-do-now\">What to do now<\/a><\/li><\/ol><\/div><!--\/OBG-G-->\n\n<p>For sustainability, export and technical teams at Thai building-materials manufacturers, the practical question is simple: when your own EPD reaches its date, can you just extend it? Under the programme\u2019s rules the answer is no, and the reason affects far more than the one EPD that just lapsed.<\/p>\n\n<!--OBG-G--><div class=\"obg obg-stats\"><div class=\"obg-stat\"><div class=\"obg-sn\">216<\/div><div class=\"obg-sl\">valid Thai-owned EPDs, 21 Oct 2026<\/div><\/div><div class=\"obg-stat\"><div class=\"obg-sn\">0<\/div><div class=\"obg-sl\">still valid on EN 15804+A1<\/div><\/div><div class=\"obg-stat\"><div class=\"obg-sn\">128<\/div><div class=\"obg-sl\">on PCR 2019:14 v1.3.4, a superseded version<\/div><\/div><div class=\"obg-stat\"><div class=\"obg-sn\">69<\/div><div class=\"obg-sl\">Thai EPDs expiring in 2029 alone<\/div><\/div><\/div><!--\/OBG-G-->\n\n<h2 id=\"what-expired-on-19-october\">What expired on 19 October<\/h2>\n<p>The expired declaration was verified in October 2021 under <strong>PCR 2012:01<\/strong>, the construction-products rule written to EN 15804+A1. EPD International\u2019s own library page records that the validity of PCR 2012:01 and its sub-PCRs <strong>ended on 28 February 2022<\/strong>, and that from 1 March 2022 <strong>PCR 2019:14<\/strong>, written to EN 15804+A2, has been the only valid main PCR for construction products. EPDs already published under A1 kept their five-year life, which is why this one ran until 2026.<\/p>\n<p>The A1-to-A2 change is not cosmetic. A2 harmonised key methods with the EU Product Environmental Footprint, replaced the older CML-based indicators with a larger set, split eutrophication into three, required the biogenic content of the product and its packaging to be declared, and in most cases made end-of-life modules C and D mandatory. EPD International\u2019s own guidance warns that A2 results will most often not be comparable with A1 results. A renewal under A2 is a new set of numbers, not a reprint.<\/p>\n\n<h2 id=\"renewal-is-a-re-verification-not-a-date-change\">Renewal is a re-verification, not a date change<\/h2>\n<p>The rulebook is the programme\u2019s <strong>General Programme Instructions, GPI 5.0.1<\/strong>, published 27 February 2025 and still the current version. Three provisions decide what renewal means.<\/p>\n\n<!--OBG-G--><div class=\"obg obg-facts\"><div class=\"obg-fact\"><div class=\"obg-fh\">Validity \u00b7 \u00a78.4.7<\/div><p>An EPD is normally valid for <b>five years from its version date<\/b>. A new PCR or GPI version does not shorten EPDs already published.<\/p><\/div><div class=\"obg-fact\"><div class=\"obg-fh\">New validity \u00b7 \u00a76.8<\/div><p>An updated EPD <b>shall undergo re-verification<\/b> unless the change is editorial, and may set a new validity period only <b>as long as the PCR is valid<\/b>. Only the verifier can confirm the new date.<\/p><\/div><div class=\"obg-fact\"><div class=\"obg-fh\">Which PCR \u00b7 \u00a78.4.9<\/div><p>You may re-verify against the original PCR, even an expired one, but then the EPD <b>keeps its original expiry<\/b>. A new validity period requires <b>a current, valid PCR version<\/b>.<\/p><\/div><div class=\"obg-fact\"><div class=\"obg-fh\">Data age \u00b7 Annex A.5.2<\/div><p>Primary data <b>shall not be more than five years old<\/b> and must stay representative for the validity period. A five-year-old study will usually need fresh data.<\/p><\/div><\/div><!--\/OBG-G-->\n\n<p>Put together, the rules mean there is no route to \u201cextend\u201d an EPD by changing a date. To get another five years, the declaration has to be brought onto the current PCR version, rebuilt on data that is recent enough, and verified again by an approved individual verifier or accredited body. GPI \u00a79.6 closes the remaining gap: an expired PCR <em>\u201cshall not be used\u2026 to make an update of a published EPD that prolongs its validity period.\u201d<\/em><\/p>\n\n<!--OBG-G--><div class=\"obg obg-quote\"><p>An updated EPD that has undergone re-verification, may set a new validity period based on the new version date\u2026 as long as the PCR is valid.<\/p><cite>EPD International, General Programme Instructions 5.0.1, \u00a76.8<\/cite><\/div><!--\/OBG-G-->\n\n<h2 id=\"the-real-renewal-wave-128-epds-on-a-superseded-pcr-version\">The real renewal wave: 128 EPDs on a superseded PCR version<\/h2>\n<p>A1 is gone, but the same logic now applies inside A2. PCR 2019:14 has been revised. Version <strong>2.0.1<\/strong> was published on 5 June 2025 and is valid until April 2030, and the library page notes that the transition period under which version 1.3.4 could still be used <strong>ended on 20 June 2025<\/strong>.<\/p>\n<p>Of the 213 valid Thai EPDs on PCR 2019:14, <strong>128 are on version 1.3.4 and 85 on version 2.0.1<\/strong>. Those 128 remain fully valid until their dates. GPI \u00a78.4.7 is explicit that a new PCR version does not shorten them. But under \u00a78.4.9 none of them can be renewed for a further five years on 1.3.4. Each will be re-verified against whatever version is current when its date arrives.<\/p>\n\n<!--OBG-G--><div class=\"obg obg-tw\"><table class=\"obg-table\"><thead><tr><th><\/th><th class=\"\">Expiring<\/th><th class=\"hi\">Thai EPDs<\/th><th class=\"\">On PCR v1.3.4<\/th><\/tr><\/thead><tbody><tr><th>2026<\/th><td class=\"\">1 (expired 19 Oct, A1)<\/td><td class=\"hi\">\u2014<\/td><\/tr><tr><th>2027<\/th><td class=\"\">2<\/td><td class=\"hi\">2<\/td><\/tr><tr><th>2028<\/th><td class=\"\">18<\/td><td class=\"hi\">18<\/td><\/tr><tr><th>2029<\/th><td class=\"\"><b>69<\/b><\/td><td class=\"hi\"><b>69<\/b><\/td><\/tr><tr><th>2030<\/th><td class=\"\">50<\/td><td class=\"hi\">39<\/td><\/tr><tr><th>2031<\/th><td class=\"\">77<\/td><td class=\"hi\">0<\/td><\/tr><\/tbody><\/table><\/div><!--\/OBG-G-->\n\n<p>The renewal cliff is <strong>2029, not now<\/strong>. Only two more Thai EPDs lapse before the end of 2027. Every one expiring between 2027 and 2029, 89 in total, is on the superseded version. For a manufacturer holding part of that cohort, the planning question is when to start a re-declaration under the current rules, not whether to.<\/p>\n\n<h2 id=\"the-one-year-window-and-what-an-expired-epd-may-not-do\">The one-year window, and what an expired EPD may not do<\/h2>\n<p>The GPI gives owners some room. Under \u00a76.9, an expired EPD can be brought back to validity <strong>if the validity period is renewed within one year of expiry<\/strong>, keeping its registration. Miss that window and it must be published as a new EPD, with a new registration number and a new registration fee.<\/p>\n<p>During that year, though, the expired declaration is of limited use. An owner may keep it visible in the library for record-keeping, as long as fees are paid. The same section says the expired EPD and its content <em>\u201cshall not be used in any kind of market application (e.g., public procurement, software programmes)\u201d<\/em> unless the programme operator grants a written exception. Green-building schemes take a similar line. BREEAM\u2019s guidance note KBCN0798 says an EPD that had expired when the product was specified cannot contribute to credits, although it need not still be valid at later submission stages.<\/p>\n\n<!--OBG-G--><div class=\"obg obg-flow\"><div class=\"obg-step\"><div class=\"obg-snum\">1<\/div><div class=\"obg-sh\">Map your dates and PCR version<\/div><div class=\"obg-sp\">List every EPD you hold, its validity date and the exact PCR version. Anything on v1.3.4 needs a full re-verification at renewal.<\/div><\/div><div class=\"obg-step\"><div class=\"obg-snum\">2<\/div><div class=\"obg-sh\">Refresh the data<\/div><div class=\"obg-sp\">Collect a recent year of production data. GPI Annex A.5.2 caps primary data at five years old.<\/div><\/div><div class=\"obg-step\"><div class=\"obg-snum\">3<\/div><div class=\"obg-sh\">Rebuild the LCA on the current PCR<\/div><div class=\"obg-sp\">Re-run the model to PCR 2019:14 v2.0.1 or its successor, with the indicator set and modules it requires.<\/div><\/div><div class=\"obg-step\"><div class=\"obg-snum\">4<\/div><div class=\"obg-sh\">Re-verify and republish<\/div><div class=\"obg-sp\">An approved verifier confirms the new validity date. Republish before expiry, or at the latest within the one-year window.<\/div><\/div><\/div><!--\/OBG-G-->\n\n<h2 id=\"the-english-rule-most-thai-teams-overlook\">The English rule most Thai teams overlook<\/h2>\n<p>One rule surprises Thai teams more than any other. GPI \u00a77.1 states that <strong>EPDs \u201cshall as a minimum be published in English\u201d<\/strong>. Thai is allowed only as an <em>additional<\/em> version, and it must carry identical content and the same registration number. A Thai version can be verified, in which case every line of it is verified and binding. Alternatively it can be a self-declared translation, which must state on its cover that only the original EPD is valid. The underlying LCA report (\u00a78.3.1) and the verification report must also be written in English.<\/p>\n<p>So the English EPD is not a translation of the real document. It is the real document. That fits a pattern we see across the instruments Thai exporters now face. CBAM\u2019s implementing rules require the operator\u2019s emissions report to be submitted in English. FTSE Russell scores Thai listed companies from their public disclosure, and Thai is not among the research languages its ESG FAQ names. In each case the English text is the version an outside reader or verifier actually reads. For an EPD that means product names, process descriptions and the declared-unit wording have to read correctly in English, and any Thai edition has to match it line for line. <a href=\"\/th\/esg-translation-risk\/\">Why ESG translation errors become disclosure risk &rarr;<\/a><\/p>\n\n<h2 id=\"where-the-evidence-runs-out\">Where the evidence runs out<\/h2>\n<p>Three caveats keep this honest.<\/p>\n<p><strong>Thai demand for EPDs is still thin.<\/strong> The March 2026 needs assessment by IISD for UNIDO found that Thai EPDs have been developed mainly for export markets and multinational client requirements, rather than in response to domestic regulatory or procurement demand. It also notes that <em>\u201cEPDs are not yet mandatory under GPP\u201d<\/em>, Thailand\u2019s green public procurement. The case for renewing is export customers and international green-building projects, not a Thai legal duty.<\/p>\n<p><strong>Buyers do not all demand A2.<\/strong> The LEED and Singapore Green Mark documents we reviewed reference EN 15804 without naming a version. The strict A2 logic above is EPD International\u2019s programme rule, and it binds anyone who wants a valid, registered EPD in that library. A buyer\u2019s own scheme may be looser.<\/p>\n<p><strong>No official renewal timeline exists.<\/strong> The programme publishes no standard duration. Vendor figures quoted in the IISD report range from four to six weeks with a software generator to six to twelve months for a conventional study, and the report itself notes that quantified evidence is scarce, and verifier availability in the region is limited. The same IISD report names the limited availability of qualified, independent verifiers as a key constraint, and none of the verifiers named on Thai EPDs is based in Thailand. Treat any timeline as an estimate.<\/p>\n\n<h2 id=\"what-to-do-now\">What to do now<\/h2>\n<!--OBG-G--><div class=\"obg obg-take\"><div class=\"obg-lb\">Key takeaways<\/div><ul><li>Pull your EPD list from the library and note <b>validity date and exact PCR version<\/b> for each. That is your renewal calendar.<\/li><li>Anything on <b>PCR 2019:14 v1.3.4<\/b> cannot be renewed on that version. Budget a re-declaration under the current version, not an extension.<\/li><li>Do not let an EPD lapse mid-tender. An expired EPD may not be used in procurement or software tools, and the <b>one-year window<\/b> only saves your registration number.<\/li><li>Lock the <b>English EPD<\/b> first. It is the binding edition under GPI \u00a77.1. Make any Thai edition match it exactly, or label it as a self-declared translation.<\/li><li>Line up data and verifier time early. Verifier capacity in the region is the constraint the independent research flags.<\/li><\/ul><\/div><!--\/OBG-G-->\n\n<!--OBG-G--><div class=\"obg obg-band\"><h4>Holding EPDs that expire in 2027\u20132029?<\/h4><p>We map your register entries to their real renewal path, rebuild the EN 15804+A2 study on current data, deliver a verified, registered EPD, and keep the English and Thai editions identical, using ISO 17100 translate-edit-proofread.<\/p><a class=\"obg-cta\" href=\"\/th\/esg-advisory\/epd-verification\/\">Talk to us about EPD renewal<\/a><\/div><!--\/OBG-G-->\n\n<p>The expiry on 19 October closed the A1 chapter in Thailand. The next one is larger. Roughly four in ten valid Thai EPDs fall due between 2027 and 2029, and every one of them will need a new study under rules that have moved since it was first verified. If your products also face the EU\u2019s construction carbon rules, start with <a href=\"\/th\/eu-cpr-carbon-declaration-thai-construction-exporters\/\">what the CPR asks of Thai exporters<\/a> \u0e41\u0e25\u0e30 <a href=\"\/th\/cbam-thailand-exporters\/\">CBAM for Thai exporters<\/a>. For the carbon numbers behind both, see <a href=\"\/th\/tgo-cfo-certification\/\">TGO CFO certification<\/a>, and for the English edition, our <a href=\"\/th\/technical-translation\/\">ISO 17100 technical translation<\/a> service. Upcoming dates are tracked on the <a href=\"\/th\/esg-regulatory-tracker\/\">ESG regulatory tracker<\/a>.<\/p>\n\n<p style=\"font-size:13px;color:rgba(255,255,255,.5)\"><em>Sources: International EPD System library, all entries filtered to Thailand-based owners (crawled 21 Oct 2026; verifier names read from each EPD PDF); EPD International, General Programme Instructions v5.0.1 (27 Feb 2025), \u00a7\u00a76.8, 6.9, 7.1, 8.3.1, 8.4.7, 8.4.9, 9.6 and Annex A.5.2; EPD International PCR library pages for PCR 2012:01 and PCR 2019:14 v2.0.1; EPD International, \u201cSunset date for GPI v.2.5 and PCRs following old EN 15804\u201d (14 Jun 2021); BRE, BREEAM KBCN0798; IISD for UNIDO, \u201cEnvironmental Product Declarations in Thailand: Needs Assessment and Recommendations for the Cement and Concrete Sectors\u201d (Mar 2026); Commission Implementing Regulation (EU) 2025\/2547, Art. 10(4); FTSE Russell ESG Scores FAQ v1.5, \u00a71.8.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Thailand\u2019s last EN 15804+A1 EPD expired on 19 October 2026. Here is what EPD International\u2019s rules say renewal really requires, why 128 Thai EPDs face a re-declaration, and the English-first rule most teams miss.<\/p>","protected":false},"author":1,"featured_media":33923,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_yoast_wpseo_title":"","_yoast_wpseo_metadesc":"","_yoast_wpseo_focuskw":"","_yoast_wpseo_canonical":"","rank_math_title":"EN 15804+A1 EPD Expiry & Renewal Rules in Thailand | Othello","rank_math_description":"Thailand\u2019s last EN 15804+A1 EPD expired 19 Oct 2026. What GPI 5.0.1 says about EPD renewal, re-verification, the one-year window and English.","rank_math_focus_keyword":"EPD renewal Thailand","rank_math_canonical_url":"","_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_meta-robots-nofollow":"","_yoast_wpseo_opengraph-title":"","_yoast_wpseo_opengraph-description":"","_yoast_wpseo_twitter-title":"","_yoast_wpseo_twitter-description":"","_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","rank_math_robots":["index","follow"]},"categories":[116],"tags":[],"class_list":["post-33922","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-esg"],"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.othellointernational.com\/wp-content\/uploads\/2026\/10\/thailand-last-en-15804-a1-epd-expired-renewal-rules-cover-hr.webp?fit=1200%2C630&ssl=1","_links":{"self":[{"href":"https:\/\/www.othellointernational.com\/th\/wp-json\/wp\/v2\/posts\/33922","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.othellointernational.com\/th\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.othellointernational.com\/th\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.othellointernational.com\/th\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.othellointernational.com\/th\/wp-json\/wp\/v2\/comments?post=33922"}],"version-history":[{"count":1,"href":"https:\/\/www.othellointernational.com\/th\/wp-json\/wp\/v2\/posts\/33922\/revisions"}],"predecessor-version":[{"id":33924,"href":"https:\/\/www.othellointernational.com\/th\/wp-json\/wp\/v2\/posts\/33922\/revisions\/33924"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.othellointernational.com\/th\/wp-json\/wp\/v2\/media\/33923"}],"wp:attachment":[{"href":"https:\/\/www.othellointernational.com\/th\/wp-json\/wp\/v2\/media?parent=33922"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.othellointernational.com\/th\/wp-json\/wp\/v2\/categories?post=33922"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.othellointernational.com\/th\/wp-json\/wp\/v2\/tags?post=33922"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}